R.033-070-2019/1S: CONSULTING ENGINEERING SERVICES FOR THE ADMINISTRATION AND MONITORING OF THE WORKS CONTRACT FOR THE RESURFACING OF NATIONAL ROAD R33 SECTION 7 FROM AMSTERDAM (km 0.0) TO N17 INTERSECTION (km 52.5)
R.036-060-2019/2S: CONSULTING ENGINEERING SERVICES FOR THE ADMINISTRATION AND MONITORING OF THE WORKS CONTRACT FOR THE RESURFACING OF NATIONAL ROAD R36 SECTION 6 FROM MANCHABENI (KM 4.70) TO TZANEEN (KM 33.50)
R.033-060-2019/1S: CONSULTING ENGINEERING SERVICES FOR THE ADMINISTRATION AND MONITORING OF THE WORKS CONTRACT FOR THE RESURFACING OF NATIONAL ROAD R33 SECTION 6 FROM MKHONDO (km 0.0) TO AMSTERDAM (km 36.0)
Regret Letter For the Removal and Replacement of Superheater Front Pendant Finishing RUL and Dipper Plate in the Boiler Pressure Parts at Kendal Power Station Unit 2.
Maintenance of the CCTV security surveillance system, Access Control System,VFSD System, EVAC System and Public Addressing System and the provision of spares on an "as- and- when" required basis
Provision of resources for the maintenance and operation of Kriel Power Station Mobile Oild purifiers including the supply of oil purification machine and portable oil tankers when required for a period of 5 years
Regret Letter for the provision of chemical cleaningon heat exchangers and condenser during outages at Arnot Power Sration for a period of three (3) years
REGRET LETTER FOR THE REMOVAL AND INSTALLATION OF BOILER WATER CIRCULATING PUMP FOR INSPECTIONS DURING OUTAGES AND OPPORTUNITY MAINTENANCE AT KENDAL POWER STATION.
Regret Letter for the refurbishment, maintenance and overhauling of fisher pneumatic valves and actuators during outages and on "an as-and-when required basis" for maintenance at Kendal Power Station.
FOR THE REPAIR AND REPLACEMENT OF REFRACTORY WORK ON BOILER AND DUCTING ON UNIT 1-6 DURING OUTAGES ON AN "AS-AND-WHEN" REQUIRED BASIS AT KENDAL POWER STATION
THE DESIGN, SUPPLY, INSTALL, COMMISSION, IMPLEMENT, MAINTAIN, CONTROL AND MONITOR A SUITABLE CHEMICAL TREATMENT PROCESS TO PREVENT SCALING OF THE ASH WATER RETURN SYSTEMS FOR THE PERIOD OF 36 MONTHS AT ARNOT POWER STATION
FOR THE PROVISION OF ANNUAL SOFTWARE LICENSES FOR ANNUAL SOFTWARE MAINTENANCE SERVICES (SMS) & SERVICE LEVEL AGREEMENT (SLA) HOURS/WORKSHOP DAYS RELATED TO THE FOLLOWING COMPUTER AIDED ENGINEERING (CAE) SOFTWARE; VIZ: - ANSYS AND ROCKY CURRENTLY USED BY T